Valentine Lake

Sprite Deposit


Summary of Resources Open Pit (0.50 g/t Au cut-off) Underground (3.0 g/t Au off) Total
Sprite Deposit Tonnes
(kt)
Au Grade
(g/t)
Gold
(oz)
Tonnes
(kt)
Au Grade
(g/t)
Gold
(oz)
Tonnes
(kt)
Au Grade
(g/t)
Gold
(oz)
Indicated 301 2.03 19,700 36 4.73 5,500 337 2.32 25,200
Inferred 158 2.72 13,800 49 5.27 8,300 207 3.32 22,100

Valentine Lake