Valentine Lake

Marathon Deposit


Deposit / Category
(Feb 2017)
Open Pit Underground Total
(0.40 g Au/t cut-off) (1.60 g Au/t cut-off Marathon Deposit 2.00 g Au/t cut-off Leprechaun)
Tonnes Grade Gold Tonnes Grade Gold Tonnes Grade Gold
(kt) (g/t) (oz) (kt) (g/t) (oz) (kt) (g/t) (oz)
M+I 8,667 1.71 475,900 83 2.93 7,900 8,750 1.72 483,800
Inferred 6,842 1.99 437,500 1,428 3.18 145,900 8,270 2.20 583,400

Valentine Lake